CSSC Haizhuang 18.0MW offshore wind turbine is about to roll off the production line

CSSC Haizhuang will launch the H260-18.0MW offshore wind turbine product, which will be officially announced and rolled off the assembly line in December 2022.

This turbine inherited from the mature technology of CSSC Haizhuang Windpower’s marine high-speed transmission chain, ensuring the stability and reliability of the transmission system. The H260-18.0MW unit is mainly for Zhejiang, Fujian, Guangdong and overseas super-class wind resource markets.

(BJX)

Share this article: