Henan Songxian Pumped Storage Power Station Project is located in the upper reaches of Beiru River in Checun Town, Songxian County, with a total investment of about 11.5 billion CNY. The proejct has a design capacity of 1.8GW, with 6 sets of 300MW reversible water pump turbine generators, and is connected to the Central China Power Grid at a voltage level of 500 kV. All units are planned to be put into operation in 2031.
(lyrb)