Offshore Wind

First turbine installed at the CHN Energy Bozhong B2 501.5MW offshore wind project

The hoisting of the first wind turbine of the CHN Energy Bozhong B2 Offshore Wind Power Project has recently been completed. The Bozhong B2 project is in the northern sea area of Dongying City, Shandong. The offshore distance of the site center is about 19km, and the water depth is 17-19m. The project has a …

First turbine installed at the CHN Energy Bozhong B2 501.5MW offshore wind project Read More »

First batch of wind turbines start operating at CGN Shandon Laizhou 304MW offshore wind project

After four and a half months of intense construction, the first batch of wind turbines of the Shandong Laizhou Offshore Wind Power Project have recently been connected to the grid and have started operation. The Laizhou project is in the northern sea area of Laizhou City, Shandong. It has a planned capacity of 304 MW …

First batch of wind turbines start operating at CGN Shandon Laizhou 304MW offshore wind project Read More »